Planning on SAP ECC

Don’t wait for S/4HANA to fix planning

ECC mainstream maintenance ends in 2027. PLAIO plans on ECC now and moves with you to S/4HANA.

Get a 30-minute review of your ECC planning

Four quick questions about how you plan today. We read them before a 30-minute call on what we’d change first.

Know how accurate it was

92.2% accuracy over the last six months at a three-month lag, with a bias of -3.9%.

Know how accurate it was. Forecast accuracy dashboard for oral liquids: 92.2% accuracy, 7.8% error and -3.9% bias at a three-month lag.
Trusted by

Leading pharmaceutical companies

Azurity
Coripharma
MS Pharma
Navamedic
AGM Pharma
Adalvo
Frostpharma
CNX Therapeutics
Arcera
Sun Wave Pharma

In their words

What planning teams say when the plan runs in PLAIO

Switch planning systems without an ERP-length project

Standard product, your real data, planners trained by go-live.

  • Generics manufacturer 3 months to go live, ERP data flows included
  • B2B pharma company 94% UAT pass rate, tested on their own data
  • B2B pharma company 13 planners trained by go-live

Every SAP shop is in the same queue

SAP ECC mainstream maintenance ends at the end of 2027. Most pharma SAP customers are planning their S/4HANA move now.

System integrators are booked, and planning waits its turn.

A migration programme puts finance and logistics first. Planning often lands in a later wave.

Until then, planners keep the plan in spreadsheets built on ECC exports.

Why it matters:

Planning doesn’t need to wait. PLAIO runs on the ECC you have today.

Forecast accuracy for oral liquids at a three-month lag: 92.2% accuracy and a bias of -3.9% over the last six months.

What you can plan on ECC today

Network map from the production site through two regional warehouses to the Germany, Nordic and Iberia markets, with exceptions marked on the nodes.

The network, supplier to market

Suppliers, CMOs, sites, warehouses and markets, with the lanes between them. Exceptions sit on the node they belong to.

Service levels by item, lowest first: Capsule 50mg at a 79.2% fill rate, then Injectable 50ml at 80.6% and Antifungal Ointment at 81.0%.

Which items miss service

Fill rate and unfulfilled demand by month and by item. See where the gap opens before it lands.

Production timeline for November and December with weekly jobs on six lines and a week of downtime across every line.

Downtime in the schedule

Production runs on a timeline, line by line. Downtime and flagged jobs show on the board.

From ECC today to S/4HANA later

SAP ECC feeds PLAIO its items, BOMs, locations, batches and open orders today. When S/4HANA goes live, the feeds switch over and the plan carries on.

ECC stays the system of record

SAP ECC keeps orders, stock and financials. PLAIO plans on items, shelf life, BOMs, CMOs, batches and open orders.

We connect SAP for you

IT opens access to SAP or its data warehouse. Our consultant checks an AI-drafted mapping. Item, location and order numbers don’t change.

S/4HANA goes live, the plan carries on

When S/4HANA goes live, the feeds switch over. Planning stays off the migration’s critical path.

No integrator programme for planning

Start on the exports you already have. Most teams are planning in PLAIO within weeks.

Planning on SAP ECC: FAQ

Mainstream maintenance for SAP ECC 6.0 on enhancement packages 6 to 8 ends on 31 December 2027. SAP offers extended maintenance to the end of 2030 at an extra cost. Older enhancement packages left mainstream maintenance at the end of 2025.

No. PLAIO connects to the SAP you run today. When S/4HANA goes live, the feeds switch over and the plan carries on. Planning stays off the migration’s critical path.

No. SAP ECC or S/4HANA stays the system of record for orders, stock and financials. PLAIO is the planning layer on top. Only planner-approved orders go back, and SAP creates them in its own process.

APO mainstream maintenance also ends in 2027. PLAIO can take over demand and supply planning from APO on the same SAP connection. See planning on SAP after APO.

Yes. Every dataset can be loaded from a spreadsheet export, and your planners map their columns once. When the connection is ready, each dataset moves to the live feed. Most teams are planning in PLAIO within weeks.

You talk with a PLAIO planning specialist about how you plan on ECC today and where the migration stands. Then you see a few of your SKUs as they would look in PLAIO. Book a time.

SAP, SAP ECC, SAP S/4HANA and SAP APO are trademarks or registered trademarks of SAP SE. PLAIO is not affiliated with or endorsed by SAP.

Bring a few SKUs. Plan them on ECC data

30 minutes on your own products, markets and CMOs, before the migration reaches planning.

Test it on a few SKUs Prefer to read first? Planning on SAP after APO

Cookie settings

To enhance your experience on our site and to analyze traffic, we use cookies. By clicking "Accept All," you agree to the storing of cookies on your device for analytics purposes. You can manage your settings or learn more in our Privacy Policy.

Manage Settings
  • Your Privacy Matters to Us

    We use cookies to improve your browsing experience and analyze how our website is used. These cookies allow us to understand trends, monitor website traffic, and gather insights to make the site better for you.

    We respect your privacy and are committed to transparent data usage.

    Why Do We Use Cookies?

    Necessary Cookies: These ensure that the website functions properly.

    Analytics Cookies: These help us track site traffic, user behavior, and performance metrics. The data collected is anonymous and allows us to continuously optimize the site.

    Preferences Cookies: We may use cookies to remember your preferences and tailor your experience.

    Marketing Cookies: We may use cookies for marketing purposes.

    Your Control, Your Choice

    By clicking "Accept All," you consent to the use of all cookies. If you prefer, you can customize your choices and opt out of certain cookies. You can learn more about how we handle data and cookies in our Privacy Policy.