| Built for pharma |
|---|
| Made for mid-market pharma | ✓Yes. Pharma manufacturers, CMOs and CDMOs, with smaller planning teams in mind | ✕Aimed at multi-billion-dollar multinationals. Not typically positioned for small or single-site companies1 |
| Shelf life and expiry | ✓In supply planning itself: batch-by-batch FEFO, minimum remaining shelf life per item and location18 | –Handled in MEIO, which o9 lists as a separate solution1,6 |
| CMO order rules | ✓Every CMO lane carries its own lead time, MOQ, order increment and maximum. Orders are rounded to fit17 | –Tier 1 and Tier 2 supplier capacities and lead times3. CMO planning data was built during its biosimilar project7 |
| Changeovers and cleaning | ✓Sequence-dependent changeovers, cleaning times, minimum and maximum waits, shifts and downtime, out of the box19 | –Not mentioned on its scheduling page. Pre-built industry templates, customisable per customer4 |
| Industry focus | ✓Pharma only, with batches, shelf life and CMOs in the core model17 | –One platform for 30-plus industries. Pharma & Biotech is a segment of Life Sciences1,2 |
| Planning engine |
|---|
| Demand, supply and production in one flow | ✓One workflow. Production orders come straight from the agreed supply plan19 | –Connected, but sold as separate solutions. Price scales with how many you deploy1 |
| Scheduling alternatives | ✓The optimizer saves up to three alternatives as draft scenarios. Nothing reaches the floor until published19,23 | ✓A sandbox for standard scenarios such as throughput maximisation or overtime minimisation4 |
| A supply plan you can trace | ✓Deterministic: the same inputs give the same orders, and each order traces to its requirement23 | ✓A solver suite to configure: heuristics, linear and mixed-integer programming or third-party solvers3,15 |
| Forecasting | ✓ML forecast per item and location, with accuracy and bias tracked at the lag you choose24 | ✓Model tournaments, ensembles and drivers such as price, promotions and weather5 |
| Rollout and running it |
|---|
| Planners run the setup | ✓Planners upload their own spreadsheets and map the columns. IT only grants access20 | Not published. Delivery is o9-led, partner-led or hybrid, with configurators trained by o9 Academy1,11 |
| Planning before the ERP link | ✓Yes. The first plan runs on the files you have, one module and one scope at a time20 | –o9’s own APO guide puts a typical enterprise migration at 12 to 24 months, selection to global rollout13 |
| ERP integration | ✓Built by the PLAIO team: AI drafts the mapping, a consultant checks it. No technical skills needed on your side21 | –Open APIs9. o9’s integration course expects Python and PySpark12 |
| Who you work with | ✓The PLAIO team, from first upload to ERP link21 | –o9, a partner or both. Accenture led about 30 o9 implementations in 20241,10 |
| Plan audit trail | ✓Every edit kept with person, time, old and new value and an optional comment22 | Not published. Its security page lists ISO 27001, SOC 1 and SOC 2 certifications14 |